Rare manufactures and installs 17km pipeline for DRD Gold

konkola-copper-mines
Konkola Copper Mine’s Muntimpa 3 Phase I, Chingola, Zambia
April 21, 2016
Kansanshi refurbishment of 10.2km’s HDPE lined steel pipe
Kansanshi refurbishment of 10.2km’s HDPE lined steel pipe
April 21, 2016

Rare manufactures and installs 17km pipeline for DRD Gold

drd-gold
The Rare Group was awarded a contract for a 17 km pipeline for DRD Gold. The contract involved installing free issue steel, and lining the steel pipe with Rare Plastic Lining technology.

The pipe line runs from The Rooikraal pumping station 6km south west from DRD Gold’s Ergo plant up to the Knights pumping station south west of Benoni.

The complete pipeline route was lined in 400m pull lengths.

 